Webinar: First-Of-Its-Kind Electric Truck Charging Facility At Port Of Long Beach: A Case Study
Time: December 6th, 9:30 AM PST (12:30 PM US EST)
What It Takes To Bring Charging Infrastructure Online and Planning for the Future.
The WattEV Port of Long Beach charging depot is the first-of-its-kind charging facility focused exclusively on electric heavy-duty trucks. The site is currently operating under its first phase with the ability to charge 26 trucks concurrently with 5 MW of capacity delivered by Southern California Edison.
The full phase of the site will include an additional 7 MW of power serving additional CCS stalls along with MCS pass-through lanes.
Join this session where we will walk through all stages of the site from start to finish to explain what it takes to get a heavy-duty truck charging depot online and how to plan for the future.